14,500 POUND ALTERNATOR REMOVAL

 

SEPARATING CUMMINS DIESEL GENSET TO REPAIR FLEX PLATES

 

MOVING VALVE ASSEMBLY INTO ELECTRONIC TEST FACILITY

 

VAULT DOOR & NIGHT DEPOSIT REMOVAL

 

WHY TAKE THE CIRCULAR STAIRCASE?

 

ANOTHER 2nd STORY JOB

 

METAL WORKING HAMMER & DRILL PRESS

 

VAULT DOOR REMOVALS

 

2800 POUNDS UP

3500 POUNDS DOWN

 

IHC TRUCK WITH 9.5 METRIC TON HIAB CRANE & 6600 POUND MAXON LIFTGATE DELIVERING CHUBB ULYSSES SAFE TO NORTHERN CANADIAN BANK

 

BANK RELOCATIONS & MERGERS

 

REMOVAL OF J&J TAYLOR FROM THE HISTORIC RESIDENCE

OF DOCTOR LOCKE OF WILLIAMSBURG ONTARIO

 

TIGHT FITTING TANN INTO A CREDIT UNION

 

GRIZZ AUGER SECURES PORTA VAULT FOR BANK

 

FROBISHER BAY VAULT ERECTION

MODULAR TANN VAULT WAS UNLOADED FROM SHIP ONTO THE BEACH & ERECTED

INTO FRAME BUILDING BUILT ON ELEVATED PERMA FROST PILINGS. NOTE THE LOW OVERHEAD CLEARANCE. "POLARMAN" (with the mask) HELPED 'SUPERVISE' THE JOB